Clean Energy
Energy storage projects generally claim the Section 48E investment credit, or the legacy Section 48 credit for earlier projects. They face prevailing wage and apprenticeship (PWA), Foreign Entity of Concern (FEOC) / prohibited foreign entity (PFE), beginning of construction (BOC), domestic content and state requirements. For storage, supply chain documentation carries particular weight.
Supply Chain
Battery cells, modules and other storage components often move through complex international supply chains.
FEOC / PFE material assistance rules and domestic content calculations both depend on where components were manufactured and by whom, so supplier documentation matters from procurement onward.
Records Flow
Where the records attach in a storage supply chain. A flow of 5 steps, in order: Battery cells, then Battery modules, then Enclosure and battery management system, then Inverters and power conversion, then Storage project. Documentation review bands: FEOC / PFE material assistance: who manufactured each component. Domestic content: where each component was manufactured and its cost. Empact works directly with suppliers at each stage to obtain the manufacturing, origin and cost records both reviews require.
Empact works directly with suppliers at each stage to obtain the manufacturing, origin and cost records both reviews require.
What Empact Manages
FAQ
Energy storage generally claims the Section 48E investment credit, or the legacy Section 48 credit for projects that began construction before 2025. Storage does not produce electricity for sale, so the Section 45Y production credit does not apply to it.
No. Under current rules, the solar-specific beginning of construction and placed in service deadlines do not apply to energy storage. Storage follows the general Section 48E rules.
Material assistance compares the cost of components from prohibited foreign entities against a threshold that depends on the technology and construction-start year. Storage supply chains often include components that need careful supplier documentation to calculate the ratio.